Task-Free, Carefree Coding
The #1 developer-trusted solution for removing unwanted prerequisite tasks. Dissolves yak shaving so you can get back to what matters.
"I just need to add a button..."
→ but first I need to update the component library
→ but first I need to upgrade Node
→ but first I need to install nvm
→ but first I need to fix my shell config
→ but first I need to update my dotfiles repo
→ but first I need to renew my SSH keys
→ but first I need to remember my GPG passphrase
→ but first...
Stop shaving. Start shipping.
Our patented TaskDissolve™ formula breaks down even the most stubborn dependency chains in under 3 minutes.
Goes beneath the surface to eliminate tasks you didn't even know were blocking you. Reaches deep into your backlog.
Won't irritate your codebase. Safe for use on legacy systems, monorepos, and even that jQuery project from 2012.
Leaves your workflow feeling silky smooth. Results last up to 2 sprints longer than manual yak shaving.
Identify your yak. Apply Yak Nair liberally to affected areas of your task list.
Let our TaskDissolve™ technology break down the causal chains binding your prerequisites.
Simply wipe away dissolved tasks. Watch as blockers disappear, revealing the smooth workflow underneath.
For Everyday Yak Shaving
$29.99 / sprint
For Legacy Codebases
$49.99 / sprint
For Coarse Infrastructure
$99.99 / sprint
I used to spend 4 hours setting up my environment before writing a single line of code. Now? I just apply Yak Nair and I'm shipping features by lunch.
Senior Frontend Engineer
My team was drowning in prerequisite tasks. Yak Nair dissolved our entire blocked backlog. Our velocity increased 300%. My manager cried.
Tech Lead, Fortune 500
I was mass years deep in a yak shaving rabbit hole. Docker configs, SSL certs, DNS propagation... One application of Yak Nair MAX and I finally deployed to production.
Site Reliability Engineer
Do not use Yak Nair on tasks that are actually important.
Side effects may include:
shipping too fast,
mass merge conflicts,
and the uncomfortable realization
that some yaks needed shaving after all.
If you experience sudden productivity lasting more than 4 sprints,
consult your engineering manager.
Keep away from project managers
— may cause unrealistic expectations.